Customization: | Available |
---|---|
Voltage: | 380V/50Hz |
The Total Power: | 9kw |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine Specification
Item | Specification | ||
Packaging Dimension | Ice Cream Paper Cone Forming Machine | Case 1 | Case 2 |
Case Size | 1360*1160*1860mm | 1560*850*850mm | |
Net Weight | 900 Kg | 400 Kg | |
Gross Weight | 950 Kg | 450 Kg | |
Packaging material | By Strong Wooden Case | ||
Capacity | 250 pcs/min | ||
Mould | 1 Set | ||
Voltage | 380V/50HZ | ||
The Total Power | 9 KW | ||
Wax Speed | 250 pcs /min | ||
Air Pressure | 0.6MPa (Dry and Clean Compressor Air) | ||
Dry Wax paper | ≤100gsm | ||
Material | Common Paper/Aluminum Foil Paper/Coated Paper etc | ||
Material Paper Gram Weight | 80 gsm to 150 gsm | ||
Paper wastage rate | Lower than 20% | ||
Container needed: | 1*20GP and 1*40GP |
Working Principle :
The sucking mouth will suck the paper, which has been printedpreviously, from the paper bracket to the transportation chain,and then transport it to the forming mould.
>>During the transportation, the paper will be spread with hot-melt glue.
>>>Theposition, length and quantity of thermal sol can be adjustedduring the production process without stopping the machine.
>>>After the for-mation, the paper spread with glue will be automatically blown to be transported to the collection machine.
>>>The piling and counting are automatic, and the paper will be carried out according to the prearranged piling numbers withoutstopping the machine.
Shipping and packing: By sea, or as your requirement.
Q: Can I have sample before order?
A: Yes for sure ,sample for free ,express charge on your account .
Q: Can you make the customized paper cone ?
A: Yes , please show us your sample first .
Q: What time for delivery ?
A: Machine about 45days after get your down payment , paper cone as the quantity .
Q: Engineer oversea service ?
A: yes ,we can send engineer help you install ,training worker until to the machine normal running.
Q: What payment term ?
A: T/T 30% down payment ,balance before delivery ,or LC at sight .